<html><head><meta http-equiv="Content-Type" content="text/html; charset=UTF-8" /></head><body style='font-size: 10pt; font-family: Verdana,Geneva,sans-serif'>
<p>;)</p>
<p><img src="./?_task=mail&_from=compose&_id=37789780657c6c5cb05e40&_action=display-attachment&_file=rcmfile31472644569011538000" alt="" width="543" height="379" /></p>
<div>---<br />
<div>Z poważaniem / Regards</div>
<div> </div>
<div><strong>Błażej Pabiszczak</strong></div>
<div><em>Chief Executive Officer</em></div>
<div>M: +48.884999123<br />E: <a title="Mail do Błażej Pabiszczak" href="mailto:b.pabiszczak@yetiforce.com">b.pabiszczak@yetiforce.com</a></div>
</div>
<p> </p>
<p>W dniu 2016-08-31 13:05, Stacey Johnson napisał(a):</p>
<blockquote type="cite" style="padding: 0 0.4em; border-left: #1010ff 2px solid; margin: 0"><!-- html ignored --><!-- head ignored --><!-- meta ignored -->
<div dir="ltr">
<div>
<div>
<div>
<div>How is overall progress in resolving issues in code.vtiger ?</div>
>From what I see, last has been touched 22 days ago.</div>
It really smells like old attic  <small><!-- time ignored --></small> here... </div>
Sad<br /><br /><br /></div>
Stacey<br /><br />
<div>
<div>
<div>
<div>
<div>
<div class="gmail_extra"><br />
<div class="gmail_quote">On Wed, Aug 31, 2016 at 4:32 PM, Alan Lord <span><<a href="mailto:alanslists@gmail.com">alanslists@gmail.com</a>></span> wrote:<br />
<blockquote class="gmail_quote" style="margin: 0px 0px 0px 0.8ex; border-left: 1px solid #cccccc; padding-left: 1ex;">On the vtiger demo (<a href="https://demo.vtiger.com">https://demo.vtiger.com</a>) system I added two leads, I then added a custom date field "Test Date" and populated it with a valid date.<br /><br /> Then I went to the Reports section and added the "Created Time" and "Test Date" fields to the Leads by Source report.<br /><br /> In the results the Test Date column is empty even though if you view the Details you will see that the field does in fact contain data.<br /><br /> I then created an Opportunity. I added the Expected Close Date field to the Potential Pipeline report and it is doing the same thing. The Expected Close Date is showing as *empty*.<br /><br /><br /> IMHO this is a really serious issue. I am amazed no-one has reported this before. Oh, I stand corrected - I see issue #292 has just been created!!!<br /><br /><br /><a href="http://code.vtiger.com/vtiger/vtigercrm/issues/292">http://code.vtiger.com/vtiger/<wbr />vtigercrm/issues/292</a><br /><br /><br /> I started looking at this because one of our customers noticed that in 6.4.0 if you look at a report which contains date fields the date was being displayed in the wrong format, e.g. YYYY-MM-DD and not the one set in the User's Preferences. However if you add the Created Time field to a report this date is displayed in the correct format.<br /><br /> I was going to suggest that they update to 6.5.0 but it would be a far worse result than what they already have!<br /><br /><br /><br /> Cheers<br /><br /> Al<br /><br /> ______________________________<wbr />_________________<br /><a href="http://www.vtiger.com/">http://www.vtiger.com/</a></blockquote>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<br />
<div class="pre" style="margin: 0; padding: 0; font-family: monospace">_______________________________________________<br /><a href="http://www.vtiger.com/">http://www.vtiger.com/</a></div>
</blockquote>
</body></html>